WW-F-2743A
3.21.4 Machine work. Tolerances and gages for metal fits shall conform to the standards of commercial practice. Finished contact and bearing surfaces shall be true and exact.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract, the contractor may use any facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification, where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5.
The inspection set forth in this document shall become a part of the contractor's overall inspection system or quality program. The absence of any inspection requirements in this document shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to
the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submissions of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.
4.1.2 Component and material inspection. Components and materials shall be inspected in accordance with all the requirements specified herein and in applicable referenced documents.
4.2 Classification of inspections. The inspection requirements specified herein are classified as follows:
a. First article inspection (see 4.2.1).
b. Quality conformance inspection (see 4.2.2).
4.2.1 First article furnace inspection. The first production furnace produced under the contract shall be inspected by the contractor at his plant under the direction and in the presence of Government representatives. This inspection shall include the examination of 4.3 and the tests of 4.4. The purpose of the inspection shall be to determine furnace conformity with the requirements of the contract. Acceptance of the first production furnace shall not constitute a waiver by the Government of its rights under the provisions of the contract.
4.2.2 Quality conformance inspection. The quality conformance inspection shall include the examination of 4.3 and the test of 4.5.
4.3 Examination. Each furnace shall be examined for compliance with the requirements specified in section 3 of this document. Any redesign or modification of the contractor's standard product
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business