MIL-PRF-14516G
multi-fuel operation, operation without electrical power, interfacing with existing military shelters,
mobility, and ruggedness.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this specification.
b. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2).
c. When a first article is required (see 3.1.).
d. Type of exhaust assembly required (see 3.4.12 and 4.4.12)
e. When a smoke jack assembly is required (see 3.4.12.2 and 4.4.12.2)
f. Sampling plan for first article and conformance test (see 4.2 and 4.3).
g. Packaging requirements (see 5.1).
h. Operators manual.
i. Replacement parts certification of interchangeability.
6.3 Subject term (key word) listing.
Diesel fired space heater
JP-8 fired space heater
Pre-fabricated shelter heating
Tent heating
6.4 Technical manuals. The requirement for technical manuals should be considered when this
specification is applied on a contract. If technical manuals are required, specifications and standards
that have been cleared and listed in DoD 5010.12-L, Acquisition Management Systems and Data
Requirements Control List (AMSDL) must be listed on a separate Contract Data Requirements List
(DD Form 1423), which is included as an exhibit to the contract. The technical manuals should be
acquired under separate contract line item in the contract.
6.5 Verification alternatives. Contracting documents should provide guidance to offerors
regarding the submission of alternatives to specified verification methods (see 4.3.3).
6.6 First article. When requiring a first article, contracting documents should provide specific
guidance to offerors. This guidance should cover whether the first article is a first article sample, a
first production item, and the number of test items. These documents should also include specific
instructions regarding arrangements for examinations, approval of first article results, and
disposition of first articles. Pre-solicitation documents should provide Government waiver rights for
first article inspection to bidders offering a previously acquired or tested product. Bidders offering
such products who wish to rely on previous testing must furnish evidence with the bid that prior
government approval is appropriate for the pending contract.
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business